joomla analytics

Please be advised that for Regina Bypass updates, effective April 4, 2017, it will be more efficient for residents if they go to the website directly.  Please follow the link to their website or call them as follows:

If you require additional information or have a specific question, please visit www.reginabypass.ca or call 1-844-679-4828.

Regina Bypass Website                                          24 Hour Contact Number  1-844-679-4828

Name Version License Size Date added  
Bypass Update - 15-Sep-16 North Service Road East of Tower Road Traffic Control Request Form Area 3 Refreshing of paint lines.pdf 1.01 MB 23/09/2016 06:44:01
Bypass Update - 15-Sep-16 Hwy 33 Traffic Control Request Form Area 3 Refreshing of paint lines.pdf 876.45 KB 23/09/2016 06:43:53
2016 9 Sept 20 Flaggers.pdf 279.55 KB 23/09/2016 06:43:12
Garbage Picking.png 1.54 MB 21/09/2016 10:01:53
Bypass Update - 9 Sept 12 Traffic Control Request Form Area 3 Installation of Girders (3).pdf 226.36 KB 16/09/2016 03:09:16
9 Sept 2 Traffic Control Request Form, Area 3, Site Preparation works at Bridge 3 (7).pdf 1.76 MB 16/09/2016 03:07:21
Bypass Update - Traffic Control Request Form Area 3 Power line work.pdf 1.99 MB 16/09/2016 03:05:37
Bypass Update - Re Intersection of Hwy48 and Hwy 1-2 08-Sep-16.pdf 1.17 MB 16/09/2016 03:05:24
Bypass Update - Re Intersection of Hwy48 and Hwy 1-2 08-Sep-16-1.pdf 1.17 MB 16/09/2016 03:05:01
Bypass Update - 9 Sept 12 Traffic Control Request Form Area 3 Installation of Girders over Hwy 1 at Hwy 48.pdf 1.95 MB 16/09/2016 03:04:56
9 Sept 2Traffic Control Request Form, Area 3, Service Road Rehabilitation (1).pdf 1.5 MB 16/09/2016 03:04:11
Bypass Upate - 9 Sept 12 Traffic Control Request Form Area 3 Foaming of Great Plains intersection.pdf 1.45 MB 16/09/2016 03:03:35
Regina Bypass - TRAFFIC UPDATE to commence Saturday September 10, 2016.docx 72.15 KB 11/09/2016 17:41:31
2016 8 30 Aug Notice__Tie In Work on Pilot Butte Access Road and North Service Road-1.pdf 315.78 KB 31/08/2016 23:44:48
8 30 Aug 2016 Detour and Closure of Pilot Butte Access Road-1.pdf 262.99 KB 31/08/2016 19:21:13

Regina Bypass Updates

  • Regina Bypass Traffic Advisory Expect Brief Delays at Night Along Highway 1 East As part of our ongoing construction of the Regina Bypass, motorists can expect brief traffic delays along Hwy 1 at the new Pilot Butte overpass starting Wednesday, June 7, weather permitting.From 10 p.m. to 4 a.m., the westbound lane of Highway 1 will be closed for 15 minutes approximately every hour as our Regina Bypass team moves girders into place for the overpass. The entire process should be completed by Sunday, June 11.Motorists are reminded to watch for workers and equipment and slow down to the posted…

  • Emerald Park Road As part of the ongoing construction of the Regina Bypass, access to Emerald Park Road will be temporarily closed to traffic from the morning of Monday, May 15 to late evening, Wednesday May 17, weather permitting.   Our Regina Bypass crew will be repaving sections of Emerald Park Road for the new on and off ramps along Highway 1 East. Traffic detour and variable message signs will be used to direct traffic to the next available exit.  NOTE: This closure was rescheduled from earlier this week due to weather and equipment issues. North Service Road (near Brandt Industries) Starting the…

  • On Wednesday, November 23, after 10pm, a 500m stretch of the Highway # 1E near Tower Road will be closed for 15 minutes as we move Power Lines. We apologize for any inconvenience, and sincerely thank all motorists for their patience.  For the latest traffic restrictions related to the Regina Bypass project, motorists are reminded to follow Regina Bypass on Twitter @reginabypass and to regularly check the Highway Hotline at http://hotline.gov.sk.ca. For additional information or questions, visit www.reginabypass.ca, follow us on Twitter @reginabypass or call our 24-hour contact centre at 1-844-679-4828.

  • Intersection of the Pilot Butte access on Highway 1 closing on October 18 Regina Bypass would like to advise residents that the intersection of the Pilot Butte access on Highway 1 will be permanently closed on Tuesday, October 18, weather permitting.  Highway access will be redirected to Gravel Pit Road via the new north and south service roads. The speed limit along this route will be reduced to 60 km/h.  The Highway 1 access closure allows the Bypass team to start work on the Pilot Butte overpass, which is scheduled to be completed in the fall of 2018.  We thank…

  • Regina Bypass would like to advise residents that the rehabbing of Highway 1 and 48 intersection is targeted to begin as early as the morning of Saturday, September 10, weather permitting.During this rehabbing session, the intersection will be closed to all traffic from Saturday morning until Sunday evening.  Detours are in place for local traffic.We thank all residents for their patience and understanding as we work to improve the safety and transportation system in the area over the long term.For the latest traffic restrictions related to the Regina Bypass project, motorists are reminded to follow Regina Bypass on Twitter @reginabypass…

  • Download Highway 46 Detour Map

  • Regina Bypass would like to advise residents that the repaving of the Highway 1 – east bound lanes – is targeted to begin Friday morning, weather permitting.Once this works begin, motorists will now travel to and from Regina on the newly paved west bound lanes. As with previous repaving, crossover lanes will allow traffic to smoothly transition from divided to undivided highway travel.The intersections of Great Plains Industrial Drive, Highway 48 at White City and Highway 46 at Balgonie will continue to have portable traffic signals to safely accommodate traffic during construction.For the latest traffic restrictions related to the Regina Bypass project, motorists are reminded to follow Regina Bypass…

  • Repaving of Hwy 364 to begin Saturday Regina Bypass would like to advise resident that the repaving of the Highway 364 is targeted to begin as early as Saturday morning, weather permitting. During the repaving, motorists can expect short delays as flaggers will safely direct the flow of traffic. While one lane is being paved, traffic will be diverted onto the other lane. The repaving work is expected to last until Sunday evening, weather permitting. This work is part of an overall paving project that began earlier this summer and will last until early fall. For the latest traffic restrictions…

  •     Traffic Control Request Form, Area 3, Paving of Top Lift.pdf  

  • Night Works near Highway 48  As part of the on-going Regina Bypass Project, we will conduct earth works near Highway 48 on a 24-hour basis. The night works are scheduled to start on Monday, August 15, 2016 – weather permitting. This works will involve hauling dirt from our borrow pit and the placement of embankment material to facilitate the construction of the new White City interchange near Highway 48. Should residents have any questions, please contact the Bypass Call Centre at 1-844-679-4828. Thanks agin for you r assistance, we really appreciate your help in keeping your residents informed on current Bypass construction.

TOWN OFFICE CONTACT INFO
1.306.781.4547 2q6scrlTRun0l5aDmcAFuAkFO2fAlJWZsERxdLULiTA     

ALL INQUIRIES
  



The times have changed…again. We have simplified the callers menu for your convenience.

You will still connect using the main number at 781-4547, and then you are prompted to select from the menu as shown below:

1. Building Permits & Accounts Payable
2. Recreation Director
3. General Office Services – Including Tax & Utility Information
4. Emergency After Hours Only

 

Go to top